MetroLink

Railway Order

STATUTORY CONSULTATION CLOSED

Please note that the An Bord Pleanála Statutory Consultation Period is now closed, as of 16th of January 2023.

 

UPDATE

Notice of Further Information (omitted document) and Notice of Extension to the Consultation Period in relation to application for the Railway (MetroLink – Estuary to Charlemont via Dublin Airport) Order [2022] – Consultation Period extended to 16th January 2023.

Newspaper Notice 25 November 2022 

A number of figures to the Planning Report (Planning Report Appendices) were omitted from the version on this website when it went live and were uploaded on 1st December 2022. They were included from the outset in the copies available at the physical display locations and in the Railway Order Application to An Bord Pleanála.


Introduction

The National Roads Authority (operating as TII) in exercise of the powers conferred upon it by Section 37 of the Transport (Railway Infrastructure) Act 2001 (as amended and substituted) (“the Act”) will apply on or after the 30th September 2022 to An Bord Pleanála for a Railway Order for the Railway (Metrolink–Estuary to Charlemont via Dublin Airport) Order [2022] pursuant to the provisions of the said Act.

 

The Railway Order, if granted, will authorise the National Roads Authority (operating as TII) to carry out railway works and all works necessary to enable the construction, operation, maintenance and improvement of a railway designated as a metro including inter alia the construction of a fully segregated and automated railway and metro mostly underground approximately 18.8km in length with 16 stations running from north of Swords at Estuary through Swords, Dublin Airport, Ballymun, Glasnevin and the City Centre to Charlemont in the south of Dublin City Centre.

A copy of the newspaper notices published in newspapers circulating along the MetroLink Route are available here;

Newspaper Notice 17th September 2022

Newspaper Notice 25th November 2022

Further information on the Railway Order application process is available here.

During the RO process, TII has provided working documents and other materials to the Independent Engineering Expert and interested members of the public to assist their understanding of the project and their submissions and observations, even though those documents are not required to be submitted as part of the RO application. In the interests of transparency, TII makes any such documents available on the main project website here.

TII has removed Schedules 2 - 10 to draft Railway Order Book of Reference from this website and from the physical display locations as the public display period, as set out in the Transport (Railway Infrastructure) Act 2001 (as amended and substituted) and advised in the Newspaper Notices, is now complete.

If you are an owner or occupier of land referred to in those Schedules and wish to seek a further relevant extract from a schedule you can contact TII directly by email on info@metrolink.ie or telephone 1800 333 777.

  • Land which may be acquired Part 1 of 2
    Land which may be acquired Part 2 of 2

  • Substratum land which may be acquired Part 1 of 4
    Substratum land which may be acquired Part 2 of 4
    Substratum land which may be acquired Part 3 of 4
    Substratum land which may be acquired Part 4 of 4

  • Land of which temporary possession may be taken Part 1 of 2
    Land of which temporary possession may be taken Part 2 of 2

  • Land over which rights of way and other easements may be acquired

  • Basements (under a public road) which may in whole or in part be acquired or affected

  • Structures to which brackets, cables, wires or other fixtures may be attached

  • Land upon which pole(s) may be erected

  • Public rights of way which may be extinguished

  • Private rights which may be extinguished

Day 1 - Monday 19th February 2024

TII Opening Day Consolidated Slide Deck - Accessible Version
Aidan Foley Witness Statement - Accessible Version
Stakeholder Communications Plan
MetroLink Preferred Route Design Development Report
Property Owner Protection Scheme (POPS)
Michael Horan Witness Statement - Accessible Version
Updated Book of Reference (included within Michael Horan's Witness Statement)
Land Acquisition Strategy (included within Michael Horan's Witness Statement)
CPO Guideline (included within Michael Horan's Witness Statement)
Ronan Hallissey Witness Statement - Accessible Version
Schedule of Errata
Schedule of Updates
Avril Challoner Witness Statement - Accessible Version
Rob Goodbody Witness Statement - Accessible Version
John Kehoe Witness Statement
Paul Brown Witness Statement - Accessible Version
Sandeep Upadhya Witness Statement - Accessible Version
Collins Avenue Assessment Report of Options
Book of Updated Railway Order Drawings
Errata Appendix 4 Chapter 9 Traffic and Transport Erratum
Errata Appendix 5 Groundborne Noise and Vibration Amendment
Errata Appendix 10 Updated Appendix 13.7 Charlemont
Errata Appendix 11 Updated Appendix 14.5 GBNV
Errata Appendix 12 Updated GBNV Figures
Errata Appendix 13 Addendum to EIAR Chapter 24
Errata Appendix 14 Errata Planning Report
Updates Appendix 1 R132 Landscape Amendments
Updates Appendix 2 Santry Lodge AHIA
Updates Appendix 3 Operational Stage Impact on Development Potential
Updates Appendix 4 Charlemont PRM Lay-by Assessment
Updates Appendix 5 Updated Planning Report
Updates Appendix 6 Draft RO and Schedules- Clean and Redline
Updates Appendix 7 New GDA Transport Strategy – Modelling Review
Updates Appendix 8 Impact on the Preliminary Design Building Damage Assessment Results due to Imposition of Limits of Deviation
Updates Appendix 9 Ground Movement Instrumentation and Monitoring
Updates Appendix 10 Outline Mobility Management Plan
Updates Appendix 11 DART MetroLink Sequencing
Legal Submissions on behalf of TII - Accessible Version

Day 2 - Tuesday 20th February 2024

Updates Appendix 6 Draft RO and Schedules - Clean (Removed as not submitted)
MetroLink Guidance Note for Developers DRAFT (Removed as not submitted)
DCU Collins Avenue Groundwater Flow Pattern (Removed as not submitted)
Collins Avenue Population Projections (Removed as not submitted)

Day 3 - Wednesday 21st February 2024

Updates Appendix 6 Draft RO and Schedules - Clean
MetroLink Guidance Note for Developers DRAFT
DCU Collins Avenue Groundwater Flow Pattern
Collins Avenue Population Projections
AZ1 Seatown West & Estuary Court 21.02.24
AZ1 O'Scanaills 21.02.24

Day 4 - Thursday 22nd February 2024

ACP Station comparison with Intervention Shaft
Regenerative Braking Technical Note
Floating Track Slab Updated 22.02.24
Letter from Roadstone to TII re Acceptance of Article 27 Compliant Material at Huntstown Quarry

Day 5 - Monday 26th February 2024

Unagreed proposed St Stephen’s Green Railway Order Conditions
Letter from TII to OPW regarding agreed conditions and accompanying plans
Sequence of Glasnevin construction slides
Letter from TII re DCC agreed conditions
Corrected settlement contour plans
Impact of draft Dublin City Transport Plan on MetroLink haulage routes
Passengers at Charlemont Station, St Stephen’s Green East and Tara Street Stations
Letter from TII re DAA agreed conditions

Day 6 - Tuesday 27th February 2024

Airport Tunnel Drawing_1_ML1-JAI-ARD-ROUT_XX-DR-Y-03035
Airport Tunnel Drawing_2_ML1-JAI-ARD-ROUT_XX-DR-Y-03036
Audibility of Alarms in Stations Note
Dewatering - Permeabilities Targeted with Grout Bottom Plug
Note on Nevinstown to R132 Link Road
Technical Note on Excavated Material
Uisce Eireann CEO Letter to TII

Day 7 - Wednesday 28th February 2024

Cumulative Impacts Addendum Report
MetroLink Floating Slab Track
Floating Slab Track Locations
MetroLink Railway Order - Fire Strategy and Intervention Shaft
R132 Seatown Villas Retained Cut Section
Derivation of the Single Bore Tunnel as the Proposed MetroLink Tunnel Option
Explanation on bentonite usage rate
Glint and glare assessment
Prediction of Groundborne Noise from Groundborne Vibration
Outline Legal Submissions on The Roles of Dublin Fire Brigade and the Commission for Railway Regulation in Relation to Fire Safety
Gillarduzzi Paper on property damage along Dublin Port Tunnel alignment
PowerPoint Presentation - Summary of Gillarduzzi Paper
GSWR Rail Bridge Clearance
Update to Chapter 5 MetroLink Construction Phase - Working Hours

Day 8 - Thursday 29th February 2024

Additional GBNV Commitments- Supporting Presentation
Additional Groundborne Noise and Vibration Commitments
Chapter 13 Airborne Noise and Vibration- Errata Table Mater Station
Provisions for Control of TBM Launch and Reception at Station Boxes
Stakeholder Engagement Plan - Updated 29 February 2024
Tunnel Lining Support - Note of Half Built Rings
Updated Appendix A5.5 Figures
Cover note on Glint and Glare Survey
Management of Bentonite Slurry during Tunnelling
Letter from Dublin Fire Brigade to TII dated 28 February 2024
Letters from Mater Misericordiae University Hospital to TII dated 28 February 2024
List of Oral Hearing Speakers as of 29 February 2024
Schedule of Environmental Commitments (Live document – subject to change)

Day 9 - Monday 4th March 2024

Letter from TII to Fingal County Council dated 1 March 2024 regarding Railway Order Condition
TII Response to Hampstead Residents CLG Submission made on 21 February 2024
TII Response to Submissions of the Elected Representatives at Charlemont Station 4 March 2024
Tunnel Alignment Saint Stephen's Green_Charlemont RO Application Alignment and Deeper Vertical Alignment Option_2 Sheets_Drawing Number ML1-JAI-RTA-ROUT_XX-DR-Y-0102
Tunnel Alignment Saint Stephen's Green_Charlemont RO Application VS Deeper Vertical Alignment Option_Drawing Number ML1-JAI-RTA-ROUT_XX-DR-Y-02027
Underground Pumping Station Drawing Number ML1-JAI-RTA-ROUT_XX-DR-Y-00601
Drawing accompanying TII letter to FCC re Santry Lodge_Drawing Number L1-JAI-ARL-SC07_GF-DR-Y-00113 Santry Lodge Feb 2024

Day 10 - Tuesday 5th March 2024

Low Point Sump Construction - Pumping Station (SSG-Charlemont) Construction Method Statement
Update to R132 Seatown Villas Retained Cut Section
MetroLink Monitoring During Construction
Noise Control from Fixed Installations
POPS Boundary Map
Dewatering assessment in Station Boxes and SCL Tunnels
Metrolink TBM Mode of Operation
Trigger Action Plan Presentation
Additional GBNV commitment
Email from Waterways Ireland to TII dated 1 March 2024
Response to EARLDEV Submission made 29 February 2024
Appended to Response to EARLDEV Submission made 29 February 2024 - Dublin Port Tunnel
Appended to Response to EARLDEV Submission made 29 February 2024 - The Copenhagen Metro Circle Line

Day 11 - Wednesday 6th March 2024

Airborne Rail Noise Effects at Glasnevin during Metrolink Project
Methodology used for assessments of the likely significant effects on buildings from ground movement and settlement (Response to Charlemont Residents)
Metrolink-Mouna Private Rising Main Interface - Technical Note and Drawings
Updated Tunnel Alignment Saint Stephen's Green_Charlemont RO Application Alignment and Deeper Vertical Alignment Option_2 Sheets_Drawing Number ML1-JAI-RTA-ROUT_XX-DR-Y-0102
Updated Tunnel Alignment Saint Stephen's Green_Charlemont RO Application VS Deeper Vertical Alignment Option_Drawing Number ML1-JAI-RTA-ROUT_XX-DR-Y-02027
Property Owners' Protection Scheme Updated 6 March 2024
Further updated Tunnel Alignment Saint Stephen's Green_Charlemont RO Application Alignment and Deeper Vertical Alignment Option_2 Sheets_Drawing Number ML1-JAI-RTA-ROUT_XX-DR-Y-01027 (P03)
Further updated Tunnel Alignment Saint Stephen's Green_Charlemont RO Application VS Deeper Vertical Alignment Option_Drawing Number ML1-JAI-RTA-ROUT_XX-DR-Y-02027 (P03)
Updated POPS Boundary Maps 06_March_2024
Working Draft - Process for the oversight and implementation of Phase 3 assessments
EIAR Addendum Downward Realignment St Stephen’s Green Station to Charlemont Station
Trigger Action Plan Note No 2 - Applicable Locations
Assessment of Boreholes data at Arthur Cox Building and Cadenza Building
Supplemental Note on Dewatering assessment in Station Boxes and SCL Tunnelsv2
Appropriate Assessment Screening Update Report (removed and re-uploaded Day 12)

Day 12 - Thursday 7th March 2024

EIAR Biodiversity Update Report and Drawings
Chapter 16 Air Quality Ecology Related Addenda to EIAR
Witness Statement of Andrew Speer
List of Oral Hearing Speakers as of 7 March 2024 (End of Module 1)
MetroLink Appropriate Assessment Update Report (resubmitted 7 March 2024)

Day 13 - Monday 11th March 2024

Review of Charlemont Station Note
Letter from Sainfoin Property Company Limited to TII
Note on Removal of Pipe and Instream Supporting Structure at the Broadmeadow River
TII Response to Public Representatives (Day 2 of the Oral Hearing)

Day 14 - Tuesday 12th March 2024

Collins Avenue EPR Summary Presentation
MetroLink AZ4 Collins Avenue Presentation
Updates to STMP - Haulage Route
Oral Hearing Station Architecture Glasnevin Presentation
Updates to Scheme Traffic Management Plan - 12.03.24

Day 15 - Wednesday 13th March 2024

MetroLink - Architecture Station Integration and Common Components Overview Presentation
Revision - Updates to Scheme Traffic Management Plan - 12.03.24
Flow Estimate - Royal Canal Way
Errata Chapter 18 Hydrology - Temporary Instream Works at Broadmeadow River
Environmental Commitments agreed with Our Lady of Victories Schools
Letter from FitzGerald and Co (on behalf of Our Lady of Victories Schools) 12 March 2024

Day 16 - Tuesday 19th March 2024

Accessibility Statement (Removed as not submitted)
Fingallians Pitches Photomontages 190324
Mater Railing Length and Green Space
Presentation on O'Connell Street Station
Update to Chapter 5 Construction Compound Spatial Requirements


Day 17 - Wednesday 20th March 2024

Tara Station Mined Option Presentation
Tara Station Location Options Considered - Supporting Slides
Pedestrian Impact Assessment at Dartmouth Road
Hostile Vehicle Mitigation Presentation
Errata relating to EIAR Chapter 11- Population and Land Use
EIAR Addendum - Leinster Street Pumping Station
Dublin Resident_anon
Dublin Non Resident_anon
Dublin Airport - NTA Passenger Survey - Foreword
Charlemont Luas- Stairs and Lift Connection

Day 18 - Thursday 21st March 2024

Building TAPS
Letter from Earldev Properties Unlimited Company to TII
Letter from Jerdip Properties Unlimited Company to TII
Jacobs IDOM Report Enhanced Building Report Aercap House
Jacobs IDOM Report Enhanced Building Report Arthur Cox
Jacobs IDOM Report Enhanced Building Report Cadenza
Accessibility Statement
Buildings Desk Study
Educational and Jobs Forecasts-Collins Avenue
EIAR Addendum_OConnell Street
Enhanced Assessment Overview
Letter to TII from the EPA re Metrolink dated 19 March 2024
Note on Issues Raised by Residents of Harcourt Terrace
Photomontage OConnell Street Upper
Planning Report Update 210324
Status of Buildings on Moore Street
Technical Note - OCSOCR Benefits vs 3rd Rail
Technical Note - Public Welfare Facilities Provision at Stations
Figure 20_16 Settlement Contour Drawings

Day 19 - Monday 25th March 2024

AIA Drawings
Appendices to Arboricultural Impact Assessment Report
Arboricultural Impact Assessment Report Update
Buildings Desk Study with Maps
Charlemont Drop-Off Biodiversity Update Report
DRAFT Schedule of Errata_ Post Day 1
DRAFT Schedule of Updates_Post Day 1
MetroLink Plan Biodiversity Policy Objective Note
Updated Drawing Combined
Updates to Appendix A5.1 Outline CEMP
Updates to Chapter 31 Mitigation
Working Draft Schedule of Additional Environmental Commitments

Day 20 - Tuesday 26th March 2024

Additional Errata Relating to Chapter 20
Drawing for Mouna -ML1-JAI-ARD-ROUT_XX-DR-Y-03047
FURTHER UPDATED FINAL Draft Railway Order - MetroLink
Further Updated Redline - FINAL Draft Railway Order - MetroLink
Hines Charlemont Planning Barriers
NTAs - ERM Model
Redline - Chapter 31 Mitigation Original and Chapter 31 Mitigation Update
Redline - original CEMP and updated CEMP
Utilities and Infrastructure Amendments Swords Pumping Station
Construction Work Sequence Grand Parade Drop Off

Day 21 - Wednesday 27th March 2024

Carrolls Building Stair and Lift
Cycle Parking Overview
Cycle Parking Provision For Transfer
EIAR Addendum Photomontages Cover Note
Final Schedule of Additional Environmental Commitments
Final Schedule of Errata_ Post Day 1
Final Schedule of Updates_Post Day 1
List of Oral Hearing Speakers 270324
MetroLink Guidance Note for Developers OUTLINE
REDLINE Operational Stage Impact on Development Potential 270324
Schedule of Third Party Agreements - 270324
Updated Schedule of Third Party Agreements
Updated - Operational Stage Impact on Development Potential Update to Ch 11
Letter from Greybirch Limited
Updated Photomontages

Day 22 - Thursday 28th March 2024

Charlemont and St Stephens Green Updates
Landscape and Visual Impacts of Design Changes at Pinnockhill
Landscape and Visual Impacts of Design Changes at Tara Street
List of Oral Hearing Speakers 280324
Note on Transport (Railway) Infrastructure Act 2001 as amended_28032024